GIS 2D

Plan Smarter with Full Visibility.

Overlay Masterplans, CAD drawings, work packages, and schedules onto one interactive map. GIS 2D replaces fragmented or manual planning methods with a single source of spatial truth for your entire project on a digital web-based system.

Main features
01

Interactive CAD & KML Overlay

02

Work Package Tracking

03

Schedule Layer Integration

04

Polygon, Line, and Location Annotations

05

Construction Status Visualization

06

Side-by-Side Model Comparison

CAD & Geospatial Overlay
01

CAD & Geospatial Overlay

Import DWG, DXF, and KML files directly onto the interactive map with adjustable transparency.

02

Work Package Progress Mapping

Visualize work package completion with color-coded zones — planned, in-progress, and completed — all geolocated on your project map for instant status awareness.

Work Package Progress Mapping
Schedule Integration with Primavera P6
03

Schedule Integration with Primavera P6

Sync your Primavera P6 schedules directly into the map view. See activity start/end dates, completion percentages, and dependencies overlaid on the spatial layout.

04

Annotation & Measurement Tools

Draw polygons, lines, and points directly on the map with custom attributes. Use built-in measurement tools to calculate distances and areas for planning verification.

Annotation & Measurement Tools
Roll Comparison View
05

Roll Comparison View

Compare two model snapshots side by side using a drag divider to visually inspect changes between different time periods — catching deviations before they escalate.

GIS 2D is most useful for:

Project Managers

Full Project Visibility

Get a single-pane view of all project zones, schedules, and progress — eliminating the need to reconcile data from multiple disconnected tools.

Planning Engineers

Digital Zone Planning

Plan and visualize construction zones spatially, overlay design drawings against the masterplan, and verify measurements directly on the map.

Site Engineers

Field-To-Office Alignment

Access real-time construction status from any device, compare as-built progress against planned schedules, and annotate issues with geo-referenced precision.

"GIS 2D gave us a single screen to see everything — CAD overlays, schedule status, location data with metadata, and masterplans — all on one map. We cut our weekly planning meetings from 5 hours to 30 minutes and finally had a single source of truth."

Senior Planning Manager
|
THE LINE, NEOM
The Line exterior in Neom
Learn more

Frequently asked questions

Where is WhiteHelmet active?

WhiteHelmet operates globally, with active presence across the Middle East, Europe, Central Asia, South Asia, and North America.

What ROI can we expect?

Based on giga-project benchmarks: Field Intelligence delivers 87% time savings and up to 75% cost reduction. Project Management Intelligence saves up to 85% on weekly tasks.

Can we start with one product and expand?

Yes. You can start with a single product, expand to a phase bundle, or go straight to the full Enterprise Construction OS — all on the same platform with no re-implementation needed.

How is WhiteHelmet priced?

Pricing depends on company size and modules selected. We offer flexible options including individual products, phase bundles, and fixed packages — so there’s a fit for every project scope and budget.

Does WhiteHelmet integrate with existing tools and third-party systems?

Yes. WhiteHelmet pulls data from leading construction and enterprise platforms — so it complements existing systems rather than replacing them overnight.

Does WhiteHelmet include an EDMS?

Yes. WhiteHelmet’s Document Management System (DMS) is a fully built-in EDMS — supporting 30+ file types, configurable approval workflows, auto-numbering, version control, digital signatures, and SLA alerts, all within the same unified platform.

WhiteHelmet products GIS 2D works well with

Field Intelligence

Field Intelligence
GIS 3D
Field Intelligence
Reporting Engine
Project Management Intelligence
Asif AI
Artificial Intelligence

Project Management Intelligence

Project Management Intelligence
GIS 3D
Field Intelligence
Reporting Engine
Project Management Intelligence
Asif AI
Artificial Intelligence